商用無料の写真検索さん
           


crawlspace

タグをコピペすると、ブログなどにカンタン貼り付けできます。

各画像のライセンスに従って利用してください。被写体の肖像権、商標・意匠登録等にご注意ください。

詳しくはクリエイティブ・コモンズ・ライセンスの利用についてをご覧ください。

CrawlSpace Waterproofing- Zion Pros- Decatur, IL
CrawlSpace Waterproofing- Zion Pros- Decatur, IL
by Decorative Concrete Kingdom

クリエイティブ・コモンズ 表示 2.1

Project 365 #238: 260817 Rat Up A Drainpipe!
Project 365 #238: 260817 Rat Up A Drainpipe!
by comedy_nose

クリエイティブ・コモンズ 表示 2.1

20150420_202938_Richtone(HDR).jpg
20150420_202938_Richtone(HDR).jpg
by stellardot

クリエイティブ・コモンズ 表示 2.1


DURING- Interior View of the addition. The sidewalls are up and the roof trusses are being set
DURING- Interior View of the addition. The sidewalls are up and the roof trusses are being set
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- The room addition shell is watertight. Rough in electric and insulation work is complete. The walls are insulated with R21, ceiling is R49, floor is R30 fiberglass insulation
DURING- The room addition shell is watertight. Rough in electric and insulation work is complete. The walls are insulated with R21, ceiling is R49, floor is R30 fiberglass insulation
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- 12 foot long sheets of drywall are installed on the walls and ceiling.
DURING- 12 foot long sheets of drywall are installed on the walls and ceiling.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- The floor has been beefed up with two layers of 3/4" plywood and a third layer of 1/2" concrete board. A heating mat is installed which will keep the tile floor warm and toasty.
DURING- The floor has been beefed up with two layers of 3/4" plywood and a third layer of 1/2" concrete board. A heating mat is installed which will keep the tile floor warm and toasty.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- self leveling concrete is installed over the heating mat.
DURING- self leveling concrete is installed over the heating mat.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- The tile floor is complete, and all sheet rock is sanded and ready for paint
DURING- The tile floor is complete, and all sheet rock is sanded and ready for paint
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- The room addition is complete. Hanging from the wall above the sliding glass door is a Mitsubishi ductless split unit that provides heat and air conditioning for the addition.
AFTER- The room addition is complete. Hanging from the wall above the sliding glass door is a Mitsubishi ductless split unit that provides heat and air conditioning for the addition.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- View of the completed interior with the custom window shades closed.
AFTER- View of the completed interior with the custom window shades closed.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- The 12 foot wide sliding glass door when open provides a 5 1/2 foot wide opening to the deck
AFTER- The 12 foot wide sliding glass door when open provides a 5 1/2 foot wide opening to the deck
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- this is sort of a before view of the addition interior as the framing is underway
DURING- this is sort of a before view of the addition interior as the framing is underway
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- both the window and door of the house will be removed or replaced. The window is directly above the kitchen sink and it will be replaced with shutters. Tthe sliding glass door will be replaced with an interior glass door.
DURING- both the window and door of the house will be removed or replaced. The window is directly above the kitchen sink and it will be replaced with shutters. Tthe sliding glass door will be replaced with an interior glass door.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- now that the addition shell is watertight the exterior siding has been removed from the wall of the house and the sliding glass door has been replaced with a plastic sheet to contain the dust.
DURING- now that the addition shell is watertight the exterior siding has been removed from the wall of the house and the sliding glass door has been replaced with a plastic sheet to contain the dust.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- interior work is almost complete. All that remains is the installation of custom cabinetry that will go against the partition wall and some electric trim-out.
DURING- interior work is almost complete. All that remains is the installation of custom cabinetry that will go against the partition wall and some electric trim-out.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- A close-up view of the new custom cabinetry
AFTER- A close-up view of the new custom cabinetry
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- The wood shutters provide some privacy when closed. The sill of the window opening was finished with granite to match the countertop.
AFTER- The wood shutters provide some privacy when closed. The sill of the window opening was finished with granite to match the countertop.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- all work is complete. The new custom cabinets are centered around what used to be the kitchen window.
AFTER- all work is complete. The new custom cabinets are centered around what used to be the kitchen window.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- New custom made window shades were installed for all the windows and the 12 foot wide sliding door.
AFTER- New custom made window shades were installed for all the windows and the 12 foot wide sliding door.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- The window above the kitchen sink was removed. The opening was trimmed out with wood jamb and casing to accent the New custom made louvered wood shutters.
AFTER- The window above the kitchen sink was removed. The opening was trimmed out with wood jamb and casing to accent the New custom made louvered wood shutters.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- The tile floor is complete, the new interior door with transom has been installed, and the window has been removed and the opening trimmed out – all that remains is a coat of paint
DURING- The tile floor is complete, the new interior door with transom has been installed, and the window has been removed and the opening trimmed out – all that remains is a coat of paint
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- The heating mat is installed over the top layer of concrete board on the subfloor.
DURING- The heating mat is installed over the top layer of concrete board on the subfloor.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- another view of the completed interior with the shades drawn
AFTER- another view of the completed interior with the shades drawn
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- The new concrete stairwell is complete. New custom made cast iron railings sit atop each of the two block walls with a stair rail  on each side.
AFTER- The new concrete stairwell is complete. New custom made cast iron railings sit atop each of the two block walls with a stair rail on each side.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- Wood forms are installed for the steps over a 4" gravel base. The top course of solid concrete block will be installed after the steps are poured. At that same time the block walls will be filled with concrete and reinforced with steel rebar.
DURING- Wood forms are installed for the steps over a 4" gravel base. The top course of solid concrete block will be installed after the steps are poured. At that same time the block walls will be filled with concrete and reinforced with steel rebar.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- all of the existing landscaping ties have been removed and the perimeter of the stairwell area has been excavated so that a concrete footing can be installed for the new concrete block walls.
DURING- all of the existing landscaping ties have been removed and the perimeter of the stairwell area has been excavated so that a concrete footing can be installed for the new concrete block walls.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- The new concrete block walls are covered with a stucco finish.
DURING- The new concrete block walls are covered with a stucco finish.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- now that the concrete work is finished you can clearly see the trench drain and the cover for the sump pump pit.
AFTER- now that the concrete work is finished you can clearly see the trench drain and the cover for the sump pump pit.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- A trench drain was installed to eliminate the clogging problem. It drains directly into a sump pit, and is also tied into the basement drain tile system in case this stairwell sump pump ever fails.
DURING- A trench drain was installed to eliminate the clogging problem. It drains directly into a sump pit, and is also tied into the basement drain tile system in case this stairwell sump pump ever fails.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


BEFORE- The 7 foot wide basement stairwell was built entirely out of 6 x 6 landscaping ties... Not only the retaining walls,  but the steps as well. The drain at the bottom of the stairwell often clogs and has caused two basement floods.
BEFORE- The 7 foot wide basement stairwell was built entirely out of 6 x 6 landscaping ties... Not only the retaining walls, but the steps as well. The drain at the bottom of the stairwell often clogs and has caused two basement floods.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- Head on view of the completed project
AFTER- Head on view of the completed project
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- this after picture gives a good view of the new basement stairwell and the stairwell railing
AFTER- this after picture gives a good view of the new basement stairwell and the stairwell railing
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER-this close up side view shows the access panel for the addition crawlspace. Also of note is the gravel that's been laid under the deck.
AFTER-this close up side view shows the access panel for the addition crawlspace. Also of note is the gravel that's been laid under the deck.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- another view of the completed deck and sunroom. Note the speakers that are mounted on the gable wall of the addition
AFTER- another view of the completed deck and sunroom. Note the speakers that are mounted on the gable wall of the addition
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- View of the main portion of the deck
AFTER- View of the main portion of the deck
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- another close-up view of the sidewalk ramp and the beautiful new landscaping.
AFTER- another close-up view of the sidewalk ramp and the beautiful new landscaping.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- wide-angle view from the corner of the deck.
AFTER- wide-angle view from the corner of the deck.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER-, close-up view of the hot tub area of the deck.. Two custom benches were also built to meet the customers needs.
AFTER-, close-up view of the hot tub area of the deck.. Two custom benches were also built to meet the customers needs.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- Where the deck floor meets the hot tub we have installed two removable panels which allow complete access for hot tub repairs.
AFTER- Where the deck floor meets the hot tub we have installed two removable panels which allow complete access for hot tub repairs.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- another view of the side portion of the deck. The deck was built using a "Azek Procell" composite floorboards.
AFTER- another view of the side portion of the deck. The deck was built using a "Azek Procell" composite floorboards.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- as you step from the sidewalk onto the deck the first thing you see are the benches. These were constructed using the same composite floorboards so that they match the deck.
AFTER- as you step from the sidewalk onto the deck the first thing you see are the benches. These were constructed using the same composite floorboards so that they match the deck.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- excavation for the sidewalk has begun
DURING- excavation for the sidewalk has begun
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING-? The concrete slab for the sidewalk is complete
DURING-? The concrete slab for the sidewalk is complete
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- this gives a good view of the ramped section of the new paver sidewalk.
AFTER- this gives a good view of the ramped section of the new paver sidewalk.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- The new paver sidewalk attaches to the deck with a gradual slope eliminating the need for a staircase.
AFTER- The new paver sidewalk attaches to the deck with a gradual slope eliminating the need for a staircase.
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- A head on view of the addition as the foundation work is being done
DURING- A head on view of the addition as the foundation work is being done
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

Footing was just poured
Footing was just poured
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


Footing, Block foundation, and slab are complete
Footing, Block foundation, and slab are complete
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

Engineered 14" I-Joists and plywood subfloor are installed
Engineered 14" I-Joists and plywood subfloor are installed
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING
DURING
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING
DURING
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING
DURING
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- addition is complete and framing for deck has begun
DURING- addition is complete and framing for deck has begun
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


DURING- framing for the deck is now complete
DURING- framing for the deck is now complete
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

AFTER- all work is complete
AFTER- all work is complete
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- addition and deck are complete, all that remains is the landscaping
DURING- addition and deck are complete, all that remains is the landscaping
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1


AFTER- The paver sidewalk which leads from the garage to the deck to the patio has a concrete slab underneath which will eliminate The possibility of any movement
AFTER- The paver sidewalk which leads from the garage to the deck to the patio has a concrete slab underneath which will eliminate The possibility of any movement
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- footers for the foundation are poured
DURING- footers for the foundation are poured
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1

DURING- foundation is complete, the engineered floor joists have been set, and the plywood subfloor is now ready to be installed
DURING- foundation is complete, the engineered floor joists have been set, and the plywood subfloor is now ready to be installed
by NLT CONSTRUCTION

クリエイティブ・コモンズ 表示 2.1



1件~60件 (全 177件)
1 2 3

(C)名入れギフト.com