Colorado Lagoon takes second step toward restoration : 無料・フリー素材/写真
Colorado Lagoon takes second step toward restoration / U.S. Army Corps of Engineers Los Angeles District
| ライセンス | クリエイティブ・コモンズ 表示-改変禁止 2.1 |
|---|---|
| 説明 | By Greg FudererLONG BEACH, Calif. -- Officials from the City of Long Beach, the U.S. Army Corps of Engineers and a number of other agencies and support groups announced the completion of the second phase of the restoration of Colorado Lagoon at a news conference held Aug. 23 along the shore of the historic body of water.The restoration of the lagoon includes three phases. The first, elimination of the flow of contaminated material and trash into the lagoon, was completed in 2010 when the city installed mechanical gates and other structures to capture and divert stormwater runoff. The third and final phase, anticipated to occur in the next five years, will construct an open water conveyance between the lagoon and the adjacent Marine Stadium Park, and the Pacific Ocean, to reestablish a more natural tidal flow.The just-completed phase removed contaminated sediment from the lagoon and re-contoured the banks to assist with tidal flow.City officials will hold an official public ceremony Aug. 25 to commemorate the reopening of the lagoon. |
| 撮影日 | 2012-08-23 11:37:32 |
| 撮影者 | U.S. Army Corps of Engineers Los Angeles District |
| タグ | |
| 撮影地 | |
| カメラ | NIKON D700 , NIKON CORPORATION |
| 露出 | 0.003 sec (1/320) |
| 開放F値 | f/10.0 |
| 焦点距離 | 17 mm |

