Wiesbaden Middle School construction : 無料・フリー素材/写真
Wiesbaden Middle School construction / USACE Europe District
| ライセンス | クリエイティブ・コモンズ 表示 2.1 |
|---|---|
| 説明 | Europe District, U.S. Army Corps of Engineers, manages the construction of Wiesbaden Middle School. Contractors Wolff & Müller and Peter Gross broke ground in November 2017 and are scheduled to complete construction by the 2018-19 school year. The two-story school will house 540 students in sixth through eighth grades.The school is designed to develop 21st-century “skills and habits” by accommodating student-centered education with functional spaces. And the building becomes a teaching tool with systems and building components exposed to provide real-world relevance and examples to reinforce the Science, Technology, Engineering and Math (STEM) curriculum.The school has increased energy efficiency with teaching models of renewable energy production to reinforce what can be done for greater energy independence. Sustainable features: Anticipated LEED Silver rating, low-flow plumbing fixtures that will generate a 41 percent savings annually, over 90 percent of the classrooms and offices have views to the outdoors. Studies show that natural lighting increases math and verbal scores. There are CO2 monitors in classrooms. Studies show a correlation between lower CO2 levels and higher levels of learning. (USACE photo by Lori Egan) |
| 撮影日 | 2017-11-17 11:53:28 |
| 撮影者 | USACE Europe District , Wiesbaden, Germany |
| タグ | |
| 撮影地 | |
| カメラ | Canon EOS 7D , Canon |
| 露出 | 0.01 sec (1/100) |
| 開放F値 | f/4.0 |
| 焦点距離 | 28 mm |

