商用無料の写真検索さん
           


151218-A-IE537-018 : 無料・フリー素材/写真

151218-A-IE537-018 / U.S. Army Corps of Engineers Los Angeles District
このタグをブログ記事に貼り付けてください。
使用画像:     注:元画像によっては、全ての大きさが同じ場合があります。
あなたのブログで、ぜひこのサービスを紹介してください!(^^
151218-A-IE537-018

QRコード

ライセンスクリエイティブ・コモンズ 表示-改変禁止 2.1
説明FORT HUACHUCA, Ariz. - During construction on Libby Army Airfield's new south ramp Dec. 18, 1st Lt. Luke Ritz, a project engineer at the Los Angeles District's Resident Office here, and Harold Colby, a construction representative from the Tucson Resident Office, supervise testing of random batches of concrete to ensure that it meets stringent design specifications."We test humidity, wind speed, ambient temperature and even the weight of a batch," said Ritz. "We make sure the concrete will cure properly to provide a long service life."Typically, concrete has four times the life expectancy of asphalt and is much more resilient for airfield operations."The project is not only fixing several versions of the south ramp," said Carol Thompson, LAAF manager. "Before, it had two major strips of concrete and two of asphalt. The asphalt was not conducive to operating large aircraft on it."LAAF and the adjacent Sierra Vista Municipal Airport are a seasonal home to the U.S. Forest Service, hosting an air tanker base for the annual wildfire season in the Southwest."When the south ramp is completed, it will be used for helicopter tankers and single engine air tankers during fire season," added Thompson. "It will also afford a place to park and service helicopters and any other aircraft not stationed here."The more than $6 million project will pour roughly 13,000 cubic yards of concrete, about 351,000 cubic feet in all.
撮影日2015-12-18 11:27:02
撮影者U.S. Army Corps of Engineers Los Angeles District
タグ
撮影地
カメラCanon EOS 70D , Canon
露出0.004 sec (1/250)
開放F値f/11.0
焦点距離24 mm


(C)名入れギフト.com