商用無料の写真検索さん
           


Coach tour of Seville - Calle Inca Garcilaso - Torre Pelli : 無料・フリー素材/写真

Coach tour of Seville - Calle Inca Garcilaso - Torre Pelli / ell brown
このタグをブログ記事に貼り付けてください。
トリミング(切り除き):
使用画像:     注:元画像によっては、全ての大きさが同じ場合があります。
サイズ:横      位置:上から 左から 写真をドラッグしても調整できます。
あなたのブログで、ぜひこのサービスを紹介してください!(^^
Coach tour of Seville - Calle Inca Garcilaso - Torre Pelli

QRコード

ライセンスクリエイティブ・コモンズ 表示-継承 2.1
説明A tour of Seville on our coach. A local tour guide talked about what we were seeing (allowing our normal tour manager to have a break for once!).Calle Inca GarcilasoTorre Pelli construction site with tall crane.Construction started in 2007 and is expected to be finished by 2015.The Cajasol Tower or Torre Pelli , as known in the city, is a building designed by Cesar Pelli currently under construction in an area called Puerto Triana in Seville. The north tower has two lower buildings with a central street. The name of the project in the study of the architect is Seville Tower .When the project was proposed was sponsored by savings El Monte and Caja San Fernando, you agree to merge in December 2006 to form the savings Cajasol , to be operational in 2007. The box is integrated into the bank CaixaBank in March 2012. Since 2013 Cajasol exists as foundation.Upon completion it will become the first skyscraper and the tallest building in the city and also in the highest Andalucía , and in the seventh tallest skyscraper in Spain , just after the skyscrapers of Madrid and Benidorm and ahead of cities like Barcelona . Construction of the building is carried out in the southern sector, Isla de la Cartuja with avenues of sponsorship and Inca Garcilaso, in a plot with an area of 59,000 m². On 17 July 2007 the first stone was laid. The tower will have a total height of 180.5 meters . The proposed building has 37 floors and elliptical of reinforced concrete above ground with 3 underground. The facade is made of glass and steel was studied and its protection against the sun with ceramic blades, although the project was changed so that these were aluminum colored tile. In 2010 the works were awarded to a Joint Venture of the builder FCC (80%) and Inabensa (20%), being the second subsidiary of Abengoa . the same year the construction of the two efificios podium is awarded to the company Isolux Corsan. In 2013 CaixaBank works awarded to Dragados completion.
撮影日2014-06-20 09:48:38
撮影者ell brown , Birmingham, United Kingdom
タグ
撮影地Sevilla, Andalucía, España 地図
カメラFinePix S2980 , FUJIFILM
露出0.008 sec (1/125)
開放F値f/8.0


(C)名入れギフト.com